Comments to TG 360 Committee – Ballot August 2010
Definitions:
Coating: (1) A liquid, liquefiable, or mastic composition that, after application to a surface, is converted into a solid protective, decorative, or functional adherent film; (2) (in a more general sense) a thin layer of solid material on a surface that provides improved protective, decorative, or functional properties. For the purposes of this standard, “Coating” is defined as an electrically insulating material applied to the surface of a metallic structure that provides an adherent film which protects a metallic structure from the surrounding electrolyte.
Reason for change: Not all coatings are “thin”. Not sure how you would define “thin”.
6.2.1.4.9 When operating pressure and conditions are conducive to high pH stress corrosion cracking, the use of polarized potentials in the cracking range relative to the temperature indicated in Figure 1 is not advised.56
This table concerns me since many times the SCC happens under disbonded coatings and that is not affected by the polarized potential measurements outside of the coating. Could there be precautionary statement to cover these situations?
6.4.3 In situations in which the temperature of the reference electrode is below 15 °C (59 °F) and above 35 °C (95 °F), refer to Table 2.
This table is very confusing to most folks and will cause many problems. Why is there not a difference when the temperature is between 15º C and 35º C? Now when you are out of these ranges we have to calculate these differences. We have already thoroughly confused the industry with reference cell conversions that change continually according to which course they are taking at the time. Is this really a serious problem? If so, why has it not been in the document before? Do we really need this?
Thanks for all the hard work and effort!
Richard Norsworthy
Polyguard Products, Inc.
214-912-9072
Friday, September 3, 2010
Wednesday, September 1, 2010
Richard Norsworthy's comments on August 2010 version
At this time I believe this is a copy that I will vote affirmative. There are some areas that need help, but this is the most reasonable version I have seen. There are some excellent changes and improvements in the overall document.
Please take time to review the document and vote as you feel neccessary, but please vote. If you vote affirmative, you can provide comments for the areas that still need some improvements or changes. This does not force the committee to change anything, but they should and I believe will address any comments.
I have not had time to provide my comments yet, but will later.
Even if this version passes, we will continue the SP0169.com blog because the TM0497 now has to begin the revision to accomodate this revision.
Thanks,
Richard
Polyguard Products, Inc.
Please take time to review the document and vote as you feel neccessary, but please vote. If you vote affirmative, you can provide comments for the areas that still need some improvements or changes. This does not force the committee to change anything, but they should and I believe will address any comments.
I have not had time to provide my comments yet, but will later.
Even if this version passes, we will continue the SP0169.com blog because the TM0497 now has to begin the revision to accomodate this revision.
Thanks,
Richard
Polyguard Products, Inc.
William Tessier comments
“The still small voice in your head must be the final arbiter when there is a conflict of duty.” –Mahatmas Gandhi
The recent discussions and debates concerning the -0.850mv “On” or “Instant Off” necessitate the need for additional dialogue among all members of the NACE family. With this brief article, I hope to encourage members throughout NACE, regardless of the position held, to let their thoughts and concerns be known as well as describe my own position.
Over forty years ago, NACE had developed a Standard Practice to offer direction for corrosion professionals around the world in determining the success of their corrosion control efforts. This Practice has also provided guidance to the U.S. federal government and other entities in their rulemaking efforts as well.
I have not aware of any compelling reasons to modify the Practice. It was created, I believe, to offer a guideline, not a de facto law of physics to say corrosion was or was not occurring. Many of us can recite numerous occasions where, despite adequate cathodic protection according to the Practice, corrosion has occurred. Perhaps equally so, narratives are abundant stating the absence of corrosion when these parameters are not met. As with any scientific theory, the status quo needs to be accepted until, and if, unequivocal evidence is given to dispute it.
Regardless of the NACE members’ propensity towards one theory or the other, one point is clear. That point is to investigate thoroughly, and mitigate to the best of their ability, any system or structure under their responsibility. The "letter" of the law must be followed consciously; the “spirit” of the law must be approached with integrity, dignity and personal conviction. This is the reason for the quote above. We need to comply with the laws that govern our industry but it is imperative to rectify any situation that is identified as having a corrosive environ whether that situation does or does not meet the “magic” -0.850 mv “On” or “Off”.
We, as corrosion control professionals and NACE members, have the ethical obligation to determine that if a system or structure is in a corrosive environment, proper prompt remedial action is taken. As leaders in a very challenging field, we must take this occasion presented from NACE and examine the different aspect of this Practice and comment accordingly. Having been acquainted with other industry specific Associations and realizing that it seldom happens; I would like members to take moment to appreciate this gift of empowerment that NACE and the Committee has bestowed upon us. Together, we will remain the principle voice in the continuous struggle to protect our environment, our communities and our assets from the devastating effects of corrosion.
My statements are not intended to discourage debate but to promote a discussion where we, as dedicated corrosion control professionals, can arrive at an acceptable solution. I propose NACE and the associated Committee, according to the established bylaws, to vote among the Committee members for acceptance or rejection of the proposed revision. If, however, the vote does not achieve a two thirds (super) majority, perhaps a vote from all NACE members can be incorporated. The process of the solicitation and receipt of votes should be relatively brief, possibly two months, and any revisions accepted or rejected according to a simple majority. If irrefutable evidence introduced in the future is vetted and accepted by a simple majority of NACE members, then, like the U.S. Constitution, the Standard can, and should be, amended.
I would like to thank everyone for allowing me the opportunity to convey my opinions on this very important topic.
Regards,
William Tessier –NACE Senior Corrosion Technologist
NACE Internal Corrosion Technologist
The recent discussions and debates concerning the -0.850mv “On” or “Instant Off” necessitate the need for additional dialogue among all members of the NACE family. With this brief article, I hope to encourage members throughout NACE, regardless of the position held, to let their thoughts and concerns be known as well as describe my own position.
Over forty years ago, NACE had developed a Standard Practice to offer direction for corrosion professionals around the world in determining the success of their corrosion control efforts. This Practice has also provided guidance to the U.S. federal government and other entities in their rulemaking efforts as well.
I have not aware of any compelling reasons to modify the Practice. It was created, I believe, to offer a guideline, not a de facto law of physics to say corrosion was or was not occurring. Many of us can recite numerous occasions where, despite adequate cathodic protection according to the Practice, corrosion has occurred. Perhaps equally so, narratives are abundant stating the absence of corrosion when these parameters are not met. As with any scientific theory, the status quo needs to be accepted until, and if, unequivocal evidence is given to dispute it.
Regardless of the NACE members’ propensity towards one theory or the other, one point is clear. That point is to investigate thoroughly, and mitigate to the best of their ability, any system or structure under their responsibility. The "letter" of the law must be followed consciously; the “spirit” of the law must be approached with integrity, dignity and personal conviction. This is the reason for the quote above. We need to comply with the laws that govern our industry but it is imperative to rectify any situation that is identified as having a corrosive environ whether that situation does or does not meet the “magic” -0.850 mv “On” or “Off”.
We, as corrosion control professionals and NACE members, have the ethical obligation to determine that if a system or structure is in a corrosive environment, proper prompt remedial action is taken. As leaders in a very challenging field, we must take this occasion presented from NACE and examine the different aspect of this Practice and comment accordingly. Having been acquainted with other industry specific Associations and realizing that it seldom happens; I would like members to take moment to appreciate this gift of empowerment that NACE and the Committee has bestowed upon us. Together, we will remain the principle voice in the continuous struggle to protect our environment, our communities and our assets from the devastating effects of corrosion.
My statements are not intended to discourage debate but to promote a discussion where we, as dedicated corrosion control professionals, can arrive at an acceptable solution. I propose NACE and the associated Committee, according to the established bylaws, to vote among the Committee members for acceptance or rejection of the proposed revision. If, however, the vote does not achieve a two thirds (super) majority, perhaps a vote from all NACE members can be incorporated. The process of the solicitation and receipt of votes should be relatively brief, possibly two months, and any revisions accepted or rejected according to a simple majority. If irrefutable evidence introduced in the future is vetted and accepted by a simple majority of NACE members, then, like the U.S. Constitution, the Standard can, and should be, amended.
I would like to thank everyone for allowing me the opportunity to convey my opinions on this very important topic.
Regards,
William Tessier –NACE Senior Corrosion Technologist
NACE Internal Corrosion Technologist
Friday, August 27, 2010
Removal of the copy of the past SP0169 revision
I was asked by NACE to remove the posted copy of the last version of the SP0169. Apparently, there is some clause that I did not read or pay any attention to. My fault and I gladly removed it.
My feeling was that those who are not on the voting ballot list should be able to see and comment on the document. I think you can go through the NACE web site under committees and eventually see a copy. If not contact the folks at NACE for help.
Also, the efforts of all of you who have commented on the recent attempt to stale the document from going to vote apparently helped some on the TG 360 committee to change their mind and vote for the current version. Maybe we did help the process to go forward!
Thanks again for all the help. I will comment on my thoughts later.
Richard
My feeling was that those who are not on the voting ballot list should be able to see and comment on the document. I think you can go through the NACE web site under committees and eventually see a copy. If not contact the folks at NACE for help.
Also, the efforts of all of you who have commented on the recent attempt to stale the document from going to vote apparently helped some on the TG 360 committee to change their mind and vote for the current version. Maybe we did help the process to go forward!
Thanks again for all the help. I will comment on my thoughts later.
Richard
Comments from George Fernandez
Richard,
I have indirectly been involved with the new stance of what criteria we should follow to ensure our pipeline is cathodically protected and safe. I have been in the business for about 26 years and I don’t know everything about corrosion that I should but I do know something about pipelines in general and especially the pipeline I’m in charge of. Our group takes care of about 1900 miles of crude oil pipeline with some old and some new systems within that asset. Part of this asset is over 55 years old and we have never had a “corrosion leak” on any of our systems – knock on wood”. I am not going into the chemical and or engineering design of what corrosion is all about because we can make this letter longer than it should be. I will agree things have changed throughout the years and we have learned through experience what works and what doesn’t work. I agree with Tom Laundrie’s comment that regulations have increased, company standards have improved, companies have developed Integrity Management Plans which are auditable by PHMSA, running smart tools, doing close interval surveys, DCVG, digs, other testing, I can go on and on. Each company/technician know their systems. I work with many peers in the industry and we learn from each other, work together to improve our systems, and strive to make sure we are doing what is right for our respective system. As a regulated system, we strive to follow all regulatory requirements and we have done a pretty good job.
I would just like to say that the committee is trying to set a criteria that will have to be followed by the industry and I just don’t think it is fair across the board. We take IR drop into consideration because it’s another level of satisfaction that we feel is necessary. Is it necessary for all, probably not due to the fact that each environment is different. Other methods of testing and requirements can be done to ensure our safety and the safety of others. The present and existing criteria is doing its job. In my case the criteria is working well.
I commend the TEG 360 committee with their efforts but I think they need to look at what their peers are saying. The committee has spent enormous amount of time on this effort and it is time to look each other in the face and say if this is the right thing to do with what has gone on in the past few years.
Again, I have learned from very notable corrosion experts and I have followed their leads. With that said, we have refined the world of corrosion and NACE has been a big part of our success. Let’s keep doing what is right and let the people in the industry do what is working for them.
Thank You
George Fernandez
I have indirectly been involved with the new stance of what criteria we should follow to ensure our pipeline is cathodically protected and safe. I have been in the business for about 26 years and I don’t know everything about corrosion that I should but I do know something about pipelines in general and especially the pipeline I’m in charge of. Our group takes care of about 1900 miles of crude oil pipeline with some old and some new systems within that asset. Part of this asset is over 55 years old and we have never had a “corrosion leak” on any of our systems – knock on wood”. I am not going into the chemical and or engineering design of what corrosion is all about because we can make this letter longer than it should be. I will agree things have changed throughout the years and we have learned through experience what works and what doesn’t work. I agree with Tom Laundrie’s comment that regulations have increased, company standards have improved, companies have developed Integrity Management Plans which are auditable by PHMSA, running smart tools, doing close interval surveys, DCVG, digs, other testing, I can go on and on. Each company/technician know their systems. I work with many peers in the industry and we learn from each other, work together to improve our systems, and strive to make sure we are doing what is right for our respective system. As a regulated system, we strive to follow all regulatory requirements and we have done a pretty good job.
I would just like to say that the committee is trying to set a criteria that will have to be followed by the industry and I just don’t think it is fair across the board. We take IR drop into consideration because it’s another level of satisfaction that we feel is necessary. Is it necessary for all, probably not due to the fact that each environment is different. Other methods of testing and requirements can be done to ensure our safety and the safety of others. The present and existing criteria is doing its job. In my case the criteria is working well.
I commend the TEG 360 committee with their efforts but I think they need to look at what their peers are saying. The committee has spent enormous amount of time on this effort and it is time to look each other in the face and say if this is the right thing to do with what has gone on in the past few years.
Again, I have learned from very notable corrosion experts and I have followed their leads. With that said, we have refined the world of corrosion and NACE has been a big part of our success. Let’s keep doing what is right and let the people in the industry do what is working for them.
Thank You
George Fernandez
Tuesday, August 24, 2010
Tom Laundrie's comments
How did Nace let this mess get this far? Let's go back to basics. Since when is any Nace document 100% technically correct. Engineering is applied science. We take scientific principles we learn in a controlled environment, such as a lab, and apply them as best we can to the "real" world environment.
I believe we learned in the lab a long time ago, that all we need to minimize corrosion is a shift of 100 millivolts. Reading Potentials of -0.85 volts On or Off is simply a shortcut that has worked for us in 99% of the cases. In other words, the -0.85 Volt Off Criteria just has a bigger safety factor built in to it than the -0.85 Volt On Criteria, taking reading errors into account. It is economical and they have proven to work by digging up the pipes and examining them. From what I keep hearing, almost all of the corrosion or problems found have been due to Interference or Shielding under disbonded tape or coatings. This is not going to change. In fact by insisting on a -0.85 volt Off Criteria, there will be a type of "current wars" and incidences of Interference damage will only increase. There may be even more disbonding, and thus more corrosion due to Shielding. Insisting on a -0.85 Volt Off Criteria will lead to more problems; not less.
With the emergence of ECDA programs in more and more companies, we should be gathering the data from all of these Direct Assessments and comparing them to the CP readings that have been taken and the Criteria that was used. This is empirical data that is just as useful as theoretical data.
The Nace Committee working on this document has a cancer in it, in the form of obstinance; and it is time that Nace cuts it out and lets the body heal.
Thank you,
Tom Laundrie
Sr. Materials Engineering Specialist
NACE Cathodic Protection Specialist
I believe we learned in the lab a long time ago, that all we need to minimize corrosion is a shift of 100 millivolts. Reading Potentials of -0.85 volts On or Off is simply a shortcut that has worked for us in 99% of the cases. In other words, the -0.85 Volt Off Criteria just has a bigger safety factor built in to it than the -0.85 Volt On Criteria, taking reading errors into account. It is economical and they have proven to work by digging up the pipes and examining them. From what I keep hearing, almost all of the corrosion or problems found have been due to Interference or Shielding under disbonded tape or coatings. This is not going to change. In fact by insisting on a -0.85 volt Off Criteria, there will be a type of "current wars" and incidences of Interference damage will only increase. There may be even more disbonding, and thus more corrosion due to Shielding. Insisting on a -0.85 Volt Off Criteria will lead to more problems; not less.
With the emergence of ECDA programs in more and more companies, we should be gathering the data from all of these Direct Assessments and comparing them to the CP readings that have been taken and the Criteria that was used. This is empirical data that is just as useful as theoretical data.
The Nace Committee working on this document has a cancer in it, in the form of obstinance; and it is time that Nace cuts it out and lets the body heal.
Thank you,
Tom Laundrie
Sr. Materials Engineering Specialist
NACE Cathodic Protection Specialist
Sunday, August 22, 2010
Comment from Joe Pikas
And Now the Rest of the Story – SP0169
NACE Central Area Conference, Corpus Christi, TX – 10-17-10
From the NACE Beginning
Let’s start with the history behind this legendary first standard produced by NACE in January, 1969. No let’s start a lot earlier in 1943 when NACE was formed in Houston, TX. Why 1943 in the middle of World War II and why Houston, TX. We could all agree that chemicals produced, pipelines serving the war effort, the Gulf environment above and below ground, operating temperatures, lack of industry standards, and did I mention the number of leaks and failures which brought this group together. “The perfect storm or the perfect venue; take your choice. Even during this massive war effort and the hiring of over 50,000 engineers, technicians and laborers to build atomic facilities to produce plutonium around the country; there were a number of smart guys who decided it was the time to start a corrosion society in this time of distress in our country. It was truly amazing that this occurred.
War is over and no standards?
What happened to NACE from 1943 to 1969? What happened to your “I Like Ike” political buttons as he fell asleep at the wheel and played golf in the early 50’s? NACE held annual conferences almost every year except during the early beginning due to the war effort. Where did all the smart guys go or do for a quarter of a century? Were we still celebrating the big ONE? What about the Korean conflict. We built the Little & Big Inch pipelines from the Gulf Coast to the Northeast only to be followed by many other others, by the way which are still in existence. Why 1969, we were still celebrating largest hippie gathering in Woodstock, NY? What more leaks and failures? Where were the standards? Were NACE and IKE on the same agenda? No wonder the flower power people took over.
Yes it took an act of Congress called the “Pipeline Safety Act” to get the wheels in motion. Was Congress finally doing their job? NACE is finally called to the rescue and to produce a standard by an organization called the Department of Transportation – Office of Pipeline Safety - Wow. How good can it get?
It’s Time to Start Your Engines
With a little nudge from DOT in preparing the Pipeline Safety Act for natural gas lines and certain companies like Transco and Tennessee Gas experiencing SCC failures back in the 60’s, NACE was encouraged to come up with a set of criteria for cathodic protection in a standard. A group of industry leaders including one of my old bosses Sal Bellasai were on the original committee to write this standard. Using their experiences and what worked in the field, they came up with a set of (field) criteria consisting of:
• -850 mV with the protective current applied (IR drop considered)
• 100 mV of polarization
• 300 mV shift
• Net protective current
• E-Log-I
Did these criteria complement each other? Yes. Did they oppose each other? Yes How can that be?
However, today, we have 3 criteria consisting of:
• -850 mV with the protective current applied (IR must be considered)
• -850 mV polarized
• 100 mV of polarization
Yes they also compliment and oppose each other just as the five criteria. But now we deleted 3 and added another -850 criterion (dueling criteria). How can that be? It goes back to the NACE Las Vegas Conference and what goes on in Vegas stays in Vegas. As you know the fight never ended back in the 60’s or the mid 90’s i.e. similar to the Korean Conflict. But somehow we were able to compromise and come up with solution after years of infighting. I cannot put this in words how this came about, but it resulted in some backdoor political compromises in the Frank Sinatra room. Just like Frank’s NY, NY; NACE makes it to Broadway with dueling -850s.
If each of these supposed criterion can oppose each other, then there must be other factors that are influencing the results. Yes, we all heard of shielding, disbondment, AC and DC interference, MIC, temperature, age, type and condition of coating, corrosive soil and electrolytes and other environmental factors. Then one must postulate that none of these criterion has an confidence level since most of the unknowns were not taken into consideration as shown in these limited number of examples.
1. A pipeline in NC exhibited a -1400 mV ON and -1100 mV OFF with several hundred millivolts of polarization yet continued to experience leaks. The coating was a single wrap of cold applied tape with minimal primer, experienced soil stress, experienced poor application and the pipe was pre-70 ERW. Yet the operator concluded and continued to state that the line was fully protected even after each of the leaks occurred.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
2. A pipeline in AL exhibited a -1300 mV ON and -1050 mV OFF with several hundred millivolts of polarization, yet a catastrophic failure occurred 2 months after a close interval survey was taken. The coating was a coal tar enamel over the ditch application, experienced soil stress, never had CP for the first 5 to 6 years, was in a low spot with poor drainage and had a history of SCC. This operator continued to show that the line was fully protected even though there was a history of SCC and no CP for five years. Everyone thought that it was SCC; however, the failure was attributed to MIC.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
3. A pipeline in North TX exhibited -1200 mV ON and -1000 mV OFF with several hundred millivolts of polarization, yet they were experiencing leaks in less than 10 years of operation. The coating was FBE, with hot applied sleeves, soil stress and poor drainage. The choice of sleeves was poor along with some application issues, but the weak link was wrinkling due to soil stresses.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
4. A new pipeline in Gulf region of TX exhibited structure to electrolyte potentials of -1400 mV ON and -1100 mV OFF with several hundred millivolts of polarization, yet the operator was experiencing indications from the in-line-inspection results of pitting. The line and joints were coated with FBE and installation of the pipe was excellent. The coating was inspected in several areas and there was some minor pinholes, minor blisters with high pH and everything appeared to be in accordance to industry standards. Why the pitting? It was near an AC high voltage line. This line was in a rights of way with many other pipelines, but they were not experiencing this issue. The soil resistivity was in the order of 250 ohm cm and it only takes several volts of AC to start AC corrosion on a FBE coated line.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
5. Conversely, let’s take a pipeline in South Texas where the structure to electrolyte potentials of -750 mV ON and -600 mV OFF. The coating was an asphalt enamel and was in poor condition and current requirements were extremely high. Everything about this line was as bad as it gets including some rock in the backfill. A direct examination revealed minor corrosion of less than 30 mils. Did I fail to mention the static potential was -250 mV and this line had several hundred millivolts of polarization, it was a dry environment and was 55 years old?
a. Did the operator meet the criteria for cathodic protection, Not in accordance to PHMSA? Was the line protected, Yes
b. It experienced less than 1 mil of pitting per year. Did it look and smell bad, Yes. However, the pipe had integrity, with little or no corrosion.
I can give hundreds more if not thousands of everyday examples of how pipelines operate with similar problems Criteria were designed to be guidelines not harden rigid rules. Why, because there are too many factors and unknowns that should be taken into consideration but are not. Basic tribal knowledge about the pipeline and its environment needs to be known. It is like driving your car in the rain with bald tires. We cannot use a criterion such as the dual -850s without knowing what is underneath the ground like the conditions of the tires. Does the pipe have any tread (coating) left. Has anyone kicked the tires or bent over to look in the ditch to see what is going on. There are companies who refuse to look deep into their systems and come to understand that shielding, MIC, interference; aged coating systems, corrosive soils, etc. are the issues and not the criteria. Then they make the bold statement, we are just going to move to -850 mV polarized criterion to make the material suppliers, contractors and others happy. What they don’t understand is that problem will not be solved. A lot of investment but little improvement in safety.
The SP0169 committee needs to recognize that these field guidelines called criteria are only as good as they fully understand the factors that really impact the integrity of the pipeline. If integrity issues are not part of the criteria, then how could we protect these lines? Any criterion will work as long as the tribal knowledge exists about the pipeline and its environment.
Recommendations:
• Get away from the simple single criterion values or numbers
• Set up system consisting of Confidence Factors (CF) or Risk Assessment (RA) Weighting
o A factor of 1.0 would be a verified laboratory test of a pipe specimen with a specific environment.
o Example of Factors that would influence readings – You the operator would set the weighting factors based on experience, environment, history for the specific pipe segment or plant setting:
Type, condition and age of coating
Isolated or grounded to power neutral or plant
When CP was first applied (within 1 year, 2 years, etc.)
How many lines in rights of way (1, 5, 25, 100, 150, etc.)
• Bonded, separation distance, stacked, etc.
Number bonds and current drain to foreign lines
Current Density to protect pipeline(s) for a specific coating, pipe diameter, length, etc.
AC/DC interference issues
Shorted to ground neutral, plant piping, casings etc.
Type of CP – Impressed, Galvanic, etc.
Environmental – resistivity, corrosivity, pH, temperature, MIC, etc.
Plant environments
• Grounding
• Mixed metals such as copper, galvanized and stainless
• Other nearby structures
o Conduit, Rebar, Tubing, Piping Runs, etc.
History of leaks or failures
Other – specific to this pipe segment or plant piping
• Get Out of Jail Free Card to offset Confidence or Risk Factors
o Pigging runs with little or no corrosion
o Other technologies such as guided wave with no corrosion
o Direct Examinations at areas of concern that validated structure to electrolyte readings
• Fully understand the integrity of the pipeline system and integrate this tribal knowledge with Corrosion Control Activities and
o History
o Construction and installation
Inspection records
Hydro test
o Coatings (Line pipe , Girth welds and fabrication piping)
Type
Condition
o CP levels
o Type of Pipe, WT, SMYS, Toughness, etc.
o Operations
Temperatures
Pigging Operations(Smart and Cleaning)
Patrolling Activities
Excavations
o Get out of the chair and get back in the ditch and really find out what is going on - involvement
o Let’s end the conflict and polarize the pipe not each other.
o No excuses, just old fashioned progress
PS
Did I fail to mention that DOT did not reference the original NACE RP0169 into the Pipeline Safety Regulations 49 CFR 192 Gas Regulations Appendix A back in 1970? ASME, API, ASTM and others were referenced but not NACE. However, DOT did create an Appendix D to Part 192 “Criteria for Cathodic Protection and Determination of Measurements”. The criteria were taken from then RP0169 along with the accepted measurement practices but no mention of NACE.
Does any know why?
If you were not at the NACE Central Area Panel Discussion in Corpus Christi, TX, the answer is that this was NACE’s first document after 26 years in existence with a little government prodding to get NACE to produce RP0169. However, it was not without controversy even at that time (IR drop is nothing new). Now we now understand this situation due to the many variables that are encountered in the right of way or the plant environment to achieve an indirect measurement to meet one of the criteria. In addition, API, ASME, ASTM was already established and had credibility, whereas NACE was finally taking their first baby step to establish standards. We have come a long way by the number of standards produced.
Note:
The above does not represent the view of any of my present or past employers (either operators or corrosion engineering companies), clients, or peers within the industry. These view points are based my 44 years of experience and findings on the many pipelines that I worked, studied and analyzed throughout the USA and the world.
Thank you,
Joe Pikas
Mobile - 832 758-0009
E-mail - jpikas@schiffassociates.com
NACE Central Area Conference, Corpus Christi, TX – 10-17-10
From the NACE Beginning
Let’s start with the history behind this legendary first standard produced by NACE in January, 1969. No let’s start a lot earlier in 1943 when NACE was formed in Houston, TX. Why 1943 in the middle of World War II and why Houston, TX. We could all agree that chemicals produced, pipelines serving the war effort, the Gulf environment above and below ground, operating temperatures, lack of industry standards, and did I mention the number of leaks and failures which brought this group together. “The perfect storm or the perfect venue; take your choice. Even during this massive war effort and the hiring of over 50,000 engineers, technicians and laborers to build atomic facilities to produce plutonium around the country; there were a number of smart guys who decided it was the time to start a corrosion society in this time of distress in our country. It was truly amazing that this occurred.
War is over and no standards?
What happened to NACE from 1943 to 1969? What happened to your “I Like Ike” political buttons as he fell asleep at the wheel and played golf in the early 50’s? NACE held annual conferences almost every year except during the early beginning due to the war effort. Where did all the smart guys go or do for a quarter of a century? Were we still celebrating the big ONE? What about the Korean conflict. We built the Little & Big Inch pipelines from the Gulf Coast to the Northeast only to be followed by many other others, by the way which are still in existence. Why 1969, we were still celebrating largest hippie gathering in Woodstock, NY? What more leaks and failures? Where were the standards? Were NACE and IKE on the same agenda? No wonder the flower power people took over.
Yes it took an act of Congress called the “Pipeline Safety Act” to get the wheels in motion. Was Congress finally doing their job? NACE is finally called to the rescue and to produce a standard by an organization called the Department of Transportation – Office of Pipeline Safety - Wow. How good can it get?
It’s Time to Start Your Engines
With a little nudge from DOT in preparing the Pipeline Safety Act for natural gas lines and certain companies like Transco and Tennessee Gas experiencing SCC failures back in the 60’s, NACE was encouraged to come up with a set of criteria for cathodic protection in a standard. A group of industry leaders including one of my old bosses Sal Bellasai were on the original committee to write this standard. Using their experiences and what worked in the field, they came up with a set of (field) criteria consisting of:
• -850 mV with the protective current applied (IR drop considered)
• 100 mV of polarization
• 300 mV shift
• Net protective current
• E-Log-I
Did these criteria complement each other? Yes. Did they oppose each other? Yes How can that be?
However, today, we have 3 criteria consisting of:
• -850 mV with the protective current applied (IR must be considered)
• -850 mV polarized
• 100 mV of polarization
Yes they also compliment and oppose each other just as the five criteria. But now we deleted 3 and added another -850 criterion (dueling criteria). How can that be? It goes back to the NACE Las Vegas Conference and what goes on in Vegas stays in Vegas. As you know the fight never ended back in the 60’s or the mid 90’s i.e. similar to the Korean Conflict. But somehow we were able to compromise and come up with solution after years of infighting. I cannot put this in words how this came about, but it resulted in some backdoor political compromises in the Frank Sinatra room. Just like Frank’s NY, NY; NACE makes it to Broadway with dueling -850s.
If each of these supposed criterion can oppose each other, then there must be other factors that are influencing the results. Yes, we all heard of shielding, disbondment, AC and DC interference, MIC, temperature, age, type and condition of coating, corrosive soil and electrolytes and other environmental factors. Then one must postulate that none of these criterion has an confidence level since most of the unknowns were not taken into consideration as shown in these limited number of examples.
1. A pipeline in NC exhibited a -1400 mV ON and -1100 mV OFF with several hundred millivolts of polarization yet continued to experience leaks. The coating was a single wrap of cold applied tape with minimal primer, experienced soil stress, experienced poor application and the pipe was pre-70 ERW. Yet the operator concluded and continued to state that the line was fully protected even after each of the leaks occurred.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
2. A pipeline in AL exhibited a -1300 mV ON and -1050 mV OFF with several hundred millivolts of polarization, yet a catastrophic failure occurred 2 months after a close interval survey was taken. The coating was a coal tar enamel over the ditch application, experienced soil stress, never had CP for the first 5 to 6 years, was in a low spot with poor drainage and had a history of SCC. This operator continued to show that the line was fully protected even though there was a history of SCC and no CP for five years. Everyone thought that it was SCC; however, the failure was attributed to MIC.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
3. A pipeline in North TX exhibited -1200 mV ON and -1000 mV OFF with several hundred millivolts of polarization, yet they were experiencing leaks in less than 10 years of operation. The coating was FBE, with hot applied sleeves, soil stress and poor drainage. The choice of sleeves was poor along with some application issues, but the weak link was wrinkling due to soil stresses.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
4. A new pipeline in Gulf region of TX exhibited structure to electrolyte potentials of -1400 mV ON and -1100 mV OFF with several hundred millivolts of polarization, yet the operator was experiencing indications from the in-line-inspection results of pitting. The line and joints were coated with FBE and installation of the pipe was excellent. The coating was inspected in several areas and there was some minor pinholes, minor blisters with high pH and everything appeared to be in accordance to industry standards. Why the pitting? It was near an AC high voltage line. This line was in a rights of way with many other pipelines, but they were not experiencing this issue. The soil resistivity was in the order of 250 ohm cm and it only takes several volts of AC to start AC corrosion on a FBE coated line.
a. Did the operator meet the criteria for cathodic protection, Yes? Was the line protected, No.?
5. Conversely, let’s take a pipeline in South Texas where the structure to electrolyte potentials of -750 mV ON and -600 mV OFF. The coating was an asphalt enamel and was in poor condition and current requirements were extremely high. Everything about this line was as bad as it gets including some rock in the backfill. A direct examination revealed minor corrosion of less than 30 mils. Did I fail to mention the static potential was -250 mV and this line had several hundred millivolts of polarization, it was a dry environment and was 55 years old?
a. Did the operator meet the criteria for cathodic protection, Not in accordance to PHMSA? Was the line protected, Yes
b. It experienced less than 1 mil of pitting per year. Did it look and smell bad, Yes. However, the pipe had integrity, with little or no corrosion.
I can give hundreds more if not thousands of everyday examples of how pipelines operate with similar problems Criteria were designed to be guidelines not harden rigid rules. Why, because there are too many factors and unknowns that should be taken into consideration but are not. Basic tribal knowledge about the pipeline and its environment needs to be known. It is like driving your car in the rain with bald tires. We cannot use a criterion such as the dual -850s without knowing what is underneath the ground like the conditions of the tires. Does the pipe have any tread (coating) left. Has anyone kicked the tires or bent over to look in the ditch to see what is going on. There are companies who refuse to look deep into their systems and come to understand that shielding, MIC, interference; aged coating systems, corrosive soils, etc. are the issues and not the criteria. Then they make the bold statement, we are just going to move to -850 mV polarized criterion to make the material suppliers, contractors and others happy. What they don’t understand is that problem will not be solved. A lot of investment but little improvement in safety.
The SP0169 committee needs to recognize that these field guidelines called criteria are only as good as they fully understand the factors that really impact the integrity of the pipeline. If integrity issues are not part of the criteria, then how could we protect these lines? Any criterion will work as long as the tribal knowledge exists about the pipeline and its environment.
Recommendations:
• Get away from the simple single criterion values or numbers
• Set up system consisting of Confidence Factors (CF) or Risk Assessment (RA) Weighting
o A factor of 1.0 would be a verified laboratory test of a pipe specimen with a specific environment.
o Example of Factors that would influence readings – You the operator would set the weighting factors based on experience, environment, history for the specific pipe segment or plant setting:
Type, condition and age of coating
Isolated or grounded to power neutral or plant
When CP was first applied (within 1 year, 2 years, etc.)
How many lines in rights of way (1, 5, 25, 100, 150, etc.)
• Bonded, separation distance, stacked, etc.
Number bonds and current drain to foreign lines
Current Density to protect pipeline(s) for a specific coating, pipe diameter, length, etc.
AC/DC interference issues
Shorted to ground neutral, plant piping, casings etc.
Type of CP – Impressed, Galvanic, etc.
Environmental – resistivity, corrosivity, pH, temperature, MIC, etc.
Plant environments
• Grounding
• Mixed metals such as copper, galvanized and stainless
• Other nearby structures
o Conduit, Rebar, Tubing, Piping Runs, etc.
History of leaks or failures
Other – specific to this pipe segment or plant piping
• Get Out of Jail Free Card to offset Confidence or Risk Factors
o Pigging runs with little or no corrosion
o Other technologies such as guided wave with no corrosion
o Direct Examinations at areas of concern that validated structure to electrolyte readings
• Fully understand the integrity of the pipeline system and integrate this tribal knowledge with Corrosion Control Activities and
o History
o Construction and installation
Inspection records
Hydro test
o Coatings (Line pipe , Girth welds and fabrication piping)
Type
Condition
o CP levels
o Type of Pipe, WT, SMYS, Toughness, etc.
o Operations
Temperatures
Pigging Operations(Smart and Cleaning)
Patrolling Activities
Excavations
o Get out of the chair and get back in the ditch and really find out what is going on - involvement
o Let’s end the conflict and polarize the pipe not each other.
o No excuses, just old fashioned progress
PS
Did I fail to mention that DOT did not reference the original NACE RP0169 into the Pipeline Safety Regulations 49 CFR 192 Gas Regulations Appendix A back in 1970? ASME, API, ASTM and others were referenced but not NACE. However, DOT did create an Appendix D to Part 192 “Criteria for Cathodic Protection and Determination of Measurements”. The criteria were taken from then RP0169 along with the accepted measurement practices but no mention of NACE.
Does any know why?
If you were not at the NACE Central Area Panel Discussion in Corpus Christi, TX, the answer is that this was NACE’s first document after 26 years in existence with a little government prodding to get NACE to produce RP0169. However, it was not without controversy even at that time (IR drop is nothing new). Now we now understand this situation due to the many variables that are encountered in the right of way or the plant environment to achieve an indirect measurement to meet one of the criteria. In addition, API, ASME, ASTM was already established and had credibility, whereas NACE was finally taking their first baby step to establish standards. We have come a long way by the number of standards produced.
Note:
The above does not represent the view of any of my present or past employers (either operators or corrosion engineering companies), clients, or peers within the industry. These view points are based my 44 years of experience and findings on the many pipelines that I worked, studied and analyzed throughout the USA and the world.